What links to “Metropolitana di Torino”
- «United for the metro» demonstration of 10 October 2026 Event
- 10 October 2026 demonstration for the completion of metro Line 1 Event
… at a press conference on 6 October 2026 a demonstration for 10 October in support of the completion of metro Line 1, whose construction site has been at a standstill for months following the bankruptcy of the company …
- Appeal by the mayors of Turin, Collegno, Grugliasco and Rivoli for the extension of metro line 1 to Cascine Vica Event
- Chiara Appendino Person
… Show to Milan, Appendino tied the continuation of her term to the approval of measures on line 2 of the metro, infrastructure, jobs and the environment:
- Collegno Place
On 4 February 2006, during the Winter Olympics, the first stretch of the metro was opened, from Collegno to Porta Susa, with its terminus at the Fermi station. On 2 August 2023 the …
- Contactless turnstile fault on the Turin metro (14 October 2026) Event
- Corso Francia Place
… raid struck the Aeronautica d'Italia aircraft factory along the boulevard. Today nine stations of the metro run beneath the boulevard.
- Eataly Organisation
… at the same address, via Ermanno Fenoglietti 14, in the Lingotto area, served by the Spezia stop of the metro. It opens every day from 8 am to 11 pm and, besides the market and restaurants, hosts wine tastings, …
- Grugliasco Place
… «Pallastraccia» and, at the end, a race of ox-drawn carts. Grugliasco is affected by the extension of metro line 1 from Fermi to Cascine Vica: on 9 July 2026 mayor Emanuele Gaito signed, together with his colleagues from …
- Gruppo Torinese Trasporti Organisation
… first major test was the metro: on 4 February 2006, on the eve of the Winter Olympics, the first stretch of Line 1 opened, between Fermi, in Collegno, and XVIII Dicembre, near Porta Susa: Italy's first automated metro. …
- Lingotto Place
On 6 March 2011, the year of the 150th anniversary of Italian unification, metro line 1 reached the Lingotto with the stretch from Porta Nuova; on 23 April 2021 the extension to piazza Bengasi …
- Night-time reopening of Turin metro Line 1 from 8 November 2026 Event
On 28 October 2026 the mayor of Turin, Stefano Lo Russo, announced that from Sunday 8 November Line 1 of the metro would return to its full evening timetable. The early closure had been in force for around three years …
- Olimpiadi invernali di Torino 2006 Event
… legacy to the City of Turin. Long-term urban construction projects ran alongside the events: line 1 of the metro, the first automatic VAL-guided system in Italy, opened on 4 February 2006 with the stretch from Collegno …
- Porta Susa Station Place
… 2008, two more on 27 September 2009; on 18 October 2009 the old Promis building was closed to trains. The metro stop, postponed until the railway station was finished, opened on 9 September 2011; the cross-city line from …
- Resumption of evening metro services in Turin (November 2026) Event
From 8 November 2026, the Turin metro (Metropolitana di Torino) resumes evening services on the line between Fermi and Bengasi on five days of the week. [1]
- Stazione di Porta Nuova Place
… walkways and car parks, while preserving the building's outer character. On 5 October 2007 line 1 of the metro reached Porta Nuova, and on 6 March 2011 it was extended a further 3.8 kilometres to Lingotto.
- Trams of Turin Place
… FIAT group. On 1 January 2003 ATM and SATTI merged into the Gruppo Torinese Trasporti, and from 2006 the metro joined the tram in urban service.
- Transport in Turin altro
From 8 November 2026 Line 1 of the metro returns to its full evening timetable, running until after midnight, after a period of early closure linked …
- Turin Place
… Olympics gave the city a strong push toward renewal. In the wake of the Games came the first line of the metro, the burial of the railway line beneath the Spina Centrale, and the pedestrianization of piazza San Carlo; …
- Turin International Book Fair Event
… region as guests of honour) attendance rose to 231,000, with 2,647 events and about 800,000 rides on the metro during the fair's days.
- Turin Metropolitan Railway Service Organisation
… complete. The Dora and Zappata stops — the latter conceived as an interchange with the future line 2 of the subway — and the new San Paolo stop are planned or under construction; according to the OTI Piemonte observatory …