Transport in Turin

Turin's urban, suburban and extra-urban public transport is run by the Gruppo Torinese Trasporti (GTT), which belongs to FCT Holding, a financial company controlled by the City of Turin, and which carries around two hundred million passengers a year; the same company also runs the automated metro system and, alongside transport, paid parking and some tourist services [1].
The metro
From 8 November 2026 Line 1 of the metro returns to its full evening timetable, running until after midnight, after a period of early closure linked to the renewal of the signalling system [5]; details are in the entry on the evening reopening.
The railways
The city is linked to Caselle Airport and the Lanzo Valleys by the Turin–Ceres railway, fifty-two kilometres long: since 20 January 2024 the new connection with the rail bypass (passante) has let trains cross the city, and on 13 September 2026 the line returned to service as far as Ceres after a three-year suspension, at the end of works worth eighty million euros funded by the PNRR (National Recovery and Resilience Plan) [2].
The area around Porta Susa station, meanwhile, is covered by a redevelopment programme agreed between the City, FS Sistemi Urbani and RFI, which provides for the restoration of the historic building and new uses for the area north of the station [4].
Space given back to pedestrians
In the centre, the pedestrianisation of via Roma, celebrated on 12 September 2026 with over fifty thousand people, has given back to pedestrians the axis between piazza Castello and piazza Carlo Felice: the street was repaved in stone and raised to the level of the porticoes, and at the junction with piazza Castello the GTT stop was reduced in size [3].
Places and companies
Who runs it
Railways and stations
Airport
Streets and pedestrian areas
Summary entry: for timetables, fares and current routes, the websites of Gruppo Torinese Trasporti and of the railways are authoritative.
Related articles: Egyptian Museum of Turin, Gruppo Torinese Trasporti, Night-time reopening of Turin metro Line 1 from 8 November 2026, Porta Susa Station, Turin-Caselle Airport, Turin-Ceres railway
Sources
- Presentazione del gruppo — GTT
- Riaperto l’ultimo tratto della Torino-Ceres: in campo 80 milioni di euro — Prima il Canavese, 13 September 2026
- Un fiume di persone ha festeggiato la nuova via Roma pedonale — TorinoClick, 14 September 2026
- Porta Susa. Approvata la convenzione che permetterà la trasformazione dell’area della stazione storica — TorinoClick, 30 October 2018
- Dall'8 novembre metro 1 di Torino di nuovo aperta fino a dopo mezzanotte (dopo 3 anni) — TorinoOggi, 28 October 2026
Similar entries
- Turin-Ceres railway Place
- Metropolitana di Torino Place