TRM
TRM is the company that operates the waste-to-energy plant at Gerbido, the waste incineration plant serving the Metropolitan City of Turin. Since it became operational, the plant's activity has been accompanied by an independent programme of health and environmental surveillance of the population living in the surrounding areas [1].
The SPoTT programme
The programme «SPoTT – Health surveillance of the population near the Turin waste-to-energy plant» was launched in 2013 with the aim of assessing the plant's possible effects on the population living in the surrounding areas, through the monitoring of environmental pollutants and human biomonitoring [1][2]. The working group is made up of Arpa Piemonte, ASL Città di Torino, ASL TO3, the Istituto superiore di sanità (national institute of health) and the Istituto zooprofilattico sperimentale del Piemonte, Liguria e Valle d'Aosta (regional veterinary public health institute), with the involvement of the local monitoring committee for the Gerbido waste-to-energy plant [1].
After a first phase concluded in 2018, the programme was expanded with SPoTT2, funded with nearly 1.9 million euros and organised into ten lines of activity [1][2]. The difficulties encountered during the pandemic, particularly for human biomonitoring, led to an extension for the three-year period 2024-2026 [1].
The extension to 2027
On 26 November 2026 the Metropolitan City of Turin announced that the SPoTT2 programme would continue into 2027 as well, with a one-year extension proposed by the working group and made possible by TRM's willingness to allocate already-budgeted and unused funds to the new activities [1][2]. The programme for 2027 provides for total spending of 194,000 euros, entirely covered by resources already allocated [1].
The planned activities include further medical assessment of cases that, in the last human biomonitoring campaign, showed values above the reference thresholds, the continuation of environmental monitoring, public meetings to present the results, training initiatives for healthcare staff, the production of informational materials and the publication of scientific reports [1][2]. Alessandro Sicchiero, the councillor responsible for the environment (assessore) at the Metropolitan City of Turin, linked the continuity of the monitoring to the prospect of building a fourth line at the waste-to-energy plant [1][2].
Sources
- Termovalorizzatore: il programma SPoTT2 prosegue anche nel 2027 — Città metropolitana di Torino, 26 November 2026
- Inceneritore, il programma di sorveglianza SPoTT2 prosegue anche nel 2027 — Eco del Chisone, 26 November 2026