Elimination of architectural barriers in Pozzo Strada

Pages linking here: 2 entries

Entry under construction: the text is still short and will be expanded.Have a source? Send it to us.

In the Pozzo Strada neighborhood of Turin, an interpellation by District 3 (Circoscrizione) councillor Davide Scanavino (Torino Bellissima) flagged height differences of up to 30 centimeters, the absence of connecting ramps and the lack of regulated pedestrian crossings in the area between corso Monte Cucco, via Delleani and via Monte Ortigara, posing risks for pedestrians, people with disabilities, the elderly and parents with strollers.1

The removal of the barriers is part of the routine maintenance contract funded by the Fondazione Crt and is scheduled to take place between mid-October 2026 and the early months of 2027.1

Related articles: Fondazione Crt, Removal of Architectural Barriers in Pozzo Strada (2026-2027)

Sources

  1. Barriere e maxi gradini, a Pozzo Strada arrivano i cantieri di Fondazione Crt — TorinoOggi, 20 September 2026

Categories

Pages linking here: 2 entries

Report a mistake.